University of California, San Diego Physical Planning
Campus Planning Administrative Records Analytical Studies & Space Planning Capital Planning Physical Planning Planning Data & Systems

2004 LRDP Environmental Impact Report


2004 LRDP Final Environmental Impact Report

  • Volume I:
    LRDP EIR
  • Volume II:
    Technical Appendices
  • Volume III: Project Level Environmental Impact Analyses
    Rady School of Management EIR
    San Diego Supercomputer Center Expansion EIR
    Hopkins Parking Structure EIR
  • Volume IV: Draft EIR Comments, Responses, and Revisions, and Mitigation Monitoring Programs
    Draft EIR Comments, Responses, and Revisions
    2004 LRDP Mitigation Monitoring Program
    Rady School of Management Mitigation Monitoring Program
    San Diego Supercomputer Center Expansion Mitigation Monitoring Program
    Hopkins Parking Structure Mitigation Monitoring Program
  • CEQA Findings


    Other EIR Information
  • 2004 LRDP EIR Background
  • 2004 Long Range Development Plan Document
  • 2004 Long Range Development Plan Web Site




    All online documents are saved in a PDF format. In order to read a PDF you must have Adobe's Acrobat Reader. Reader is free from Adobe.com
  • 2004 LRDP EIR Background

    UC San Diego prepared an Environmental Impact Report (EIR) to evaluate the environmental effects of growth under the new 2004 Long Range Development Plan (LRDP). This LRDP EIR has been prepared pursuant to section 21080.09 of the California Environmental Quality Act (CEQA). The 2004 LRDP EIR is a Program EIR that can be used at the program level in the future environmental review of and subsequent tiering of project specific campus development through plan horizon year 2020.

    Back to top

    2004 LRDP Environmental Impact Report

    Volume I: LRDP EIR

  • Cover and Table of Contents (23 Pages - PDF 1303Kb)
  • Chapter 1: Introduction (12 Pages - PDF 976Kb)
  • Chapter 2: Executive Summary (20 Pages - PDF 726Kb)
  • Chapter 3: Project Description (38 Pages - PDF 3,703Kb)
  • Chapter 4: Environmental Setting, Impacts, and Mitigation (8 Pages - PDF 441Kb)
  • Chapter 5: Other CEQA Considerations (8 Pages - PDF 443Kb)
  • Chapter 6: Alternatives (18 Pages - PDF 1608Kb)
  • Chapter 7: Preparers and Persons Contacted (6 Pages - PDF 345Kb)

    Back to top

    Volume II: Appendices

  • Volume II Cover and Table of Contents (6 Pages - PDF 570Kb)
  • Appendix A: Initial Study and Notices of Preparation / Scoping
  • Appendix B: Air Quality Technical Report and Health Risk Assessment
  • Appendix C: Biology Technical Report (82 Pages - PDF 4,141Kb)
  • Appendix D: Geological Technical Report (40 Pages - PDF 4,228Kb)
  • Appendix E: Hazardous Materials File Review
  • Appendix F: Hydrology Report (324 Pages - PDF 2,314Kb)
  • Appendix G: Noise Technical Report (66 Pages - PDF 5,226Kb)
  • Appendix H: Population and Housing Technical Report (14 Pages - PDF 128Kb)
  • Appendix I: Traffic Analysis Report (244 Pages - PDF 3,286Kb)
  • J: Water Supply Assessment Report (28 Pages - PDF 119Kb)
  • * A Cultural Resources Technical Report was prepared for this EIR. It contains sensitive information
    regarding the location and nature of cultural resources and, pursuant to federal law, is not made
    available to the general public. Qualified individuals may view the report by appointment at the
    UCSD Physical Planning office.

    Back to top

    Volume III: Project Level Environmental Impact Analyses

  • Introduction to Volume III (10 Pages - PDF 573Kb)

    Rady School of Management EIR

  • Chapter 1: Table of Contents and Introduction (14 Pages - PDF 805Kb)
  • Chapter 2: Executive Summary (14 Pages - PDF 661Kb)
  • Chapter 3: Project Description (18 Pages - PDF 1,260Kb)
  • Chapter 4: Environmental Setting, Impacts, and Mitigation (116 Pages - PDF 6,078Kb)
  • Chapter 5: Other CEQA Considerations (6 Pages - PDF 448Kb)
  • Chapter 6: Alternatives (12 Pages - PDF 1,147Kb)
  • Chapter 7: Preparers and Persons Contacted & Appendix A (10 Pages - PDF 1,361Kb)

    Back to top

    San Diego Supercomputer Center Expansion EIR

  • Chapter 1: Table of Contents and Introduction (14 Pages - PDF 907Kb)
  • Chapter 2: Executive Summary (14 Pages - PDF 725Kb)
  • Chapter 3: Project Description (14 Pages - PDF 1,369Kb)
  • Chapter 4: Environmental Setting, Impacts, and Mitigation (114 Pages - PDF 4,808Kb)
  • Chapter 5: Other CEQA Considerations (6 Pages - PDF 448Kb)
  • Chapter 6: Alternatives (10 Pages - PDF 1,020Kb)
  • Chapter 7: Preparers and Persons Contacted (2 Pages - PDF 312Kb)

    Back to top

    Hopkins Parking Structure EIR

  • Chapter 1: Table of Contents and Introduction (14 Pages - PDF 565Kb)
  • Chapter 2: Executive Summary (14 Pages - PDF 669Kb)
  • Chapter 3: Project Description (14 Pages - PDF 1,133Kb)
  • Chapter 4: Environmental Setting, Impacts, and Mitigation (128 Pages - PDF 6,271Kb)
  • Chapter 5: Other CEQA Considerations (6 Pages - PDF 495Kb)
  • Chapter 6: Alternatives (10 Pages - PDF 822Kb)
  • Chapter 7: Preparers and Persons Contacted (2 Pages - PDF 197Kb)
  • Appendix A: Noise Analysis (26 Pages - PDF 1,063Kb)
  • Appendix B: Traffic Impact Analysis (30 Pages - PDF 3,995Kb)

    Back to top

    Final EIR Volume IV: Draft EIR Comments, Responses, and Revisions, and Mitigation Monitoring Programs

  • Cover and Introduction (5 Pages - PDF 413Kb)
  • Draft EIR Comments, Responses, and Revisions
  • 2004 LRDP Mitigation Monitoring Program (30 Pages - PDF 1,220Kb)
  • Rady School of Management Mitigation Monitoring Program (16 Pages - PDF 744Kb)
  • San Diego Supercomputer Center Expansion Mitigation Monitoring Program (10 Pages - PDF 544Kb)
  • Hopkins Parking Structure Mitigation Monitoring Program (14 Pages - PDF 688Kb)

    Back to top

    CEQA Findings

  • 2004 LRDP Findings (80 Pages - PDF 265Kb)

    Back to top



  • Physical Planning

    Copyright ©2004 Regents of the University of California. All rights reserved.
    UCSD - Official web page of the University of California, San Diego