Current Projects

This page provides access to environmental documents for UCSD projects currently under public review and/or pending environmental approval. Documents are best viewed using Windows Internet Explorer (Click here to download latest version).



Campus Projects Currently Under Environmental Review

Mesa Housing Nuevo West and East Project

August 25, 2017

In accordance with established University of California procedures, it is anticipated that the proposed Environmental Impact Report (EIR) for this project (SCH# 2017011048) would be considered by the UC Board of Regents at their November meeting which runs from November 15 - 16, 2017. The draft EIR is available to view and/or print by clicking on the links below.

The public review period for the Draft EIR will extend from August 25, 2017 through October 9, 2017. A public hearing on the Draft EIR will be held at 6:00 p.m. on Monday, September 18 at the UC San Diego Faculty Club. Directions can be found at: http://facclub.ucsd.edu/directions/index.html. Enter the building on the west side and ask the receptionist inside on the left for a parking pass to place on your car dashboard. The hearing will be held in the Faculty Club's Seuss Library.

Any comments regarding accuracy of the Draft EIR should be emailed to env-review@ucsd.edu or mailed to:

Ms. Catherine Presmyk
University of California, San Diego
Campus Planning Office
9500 Gilman Drive, MC 0074
La Jolla, CA 92093-0074.


Your response may be sent at the earliest possible date, but no later than 5:00 p.m. on October 9, 2017. If you have any questions please contact Lauren Kahal at (858) 246-2914.

Note: Documents are best viewed using Google Chrome.

Mesa Housing Nuevo West and East Environmental Impact Report

EIR

Technical Appendices

Appendix A - Notice of Preparation (NOP) and Response Letters
Appendix B - Air Quality and Greenhouse Gas Emissions Technical Report
Appendix C - Biological Resources Letter Report
Appendix D - Preliminary Drainage Study Nuevo West Student Housing
Appendix E - Preliminary Drainage Study Nuevo East Student Housing
Appendix F - Miramar Street and Athena Circle Improvements Drainage Study
Appendix G - Transportation Impact Study
Appendix H - Athena Connector Project Traffic Study
Appendix I - Report of Geotechnical Investigation Nuevo West
Appendix J - Report of Geotechnical Investigation Nuevo East
Appendix K - Noise Analysis for Nuevo West
Appendix K - Noise Analysis for Nuevo East


Campus Projects Currently Pending Environmental Approval

There are no environmental documents for UC San Diego projects currently pending environmental approval.



There are two additional ways to review draft environmental documents for currently proposed campus projects:

  1. By appointment at UCSD Physical and Community Planning Office. Call Ruby Mo at (858) 534-6515 to schedule an appointment.

  2. Printed versions of draft environmental documents are available for review during normal operating hours at:

Newsletter and Monthly Updates

Quarterly Newsletters Monthly Updates


Environmental Document Review

Click here to view current projects under public review. Click here to join the Environmental Review Mailing List to be notified via email when new projects are under review.


Useful Links

  • About UCSD
  • Resource Management and Planning
  • Facilities Design and Construction
  • Capital Planning
  • Institutional Research
  • Facilities Information System
  • UCSD News